Quick Answer
Multiply length × width × thickness (in feet) to get cubic feet, then divide by 27 for cubic yards. A 20 × 12 ft patio 4 in thick is 80 cu ft, or 2.96 cubic yards. With 5% extra that is 3.11 yd³: order 3.25 yd³ of ready-mix, or buy 140 bags of 80 lb mix.
Embed this calculator
Adjust the size if needed, then copy the code below into your page or blog. The calculator will load in an iframe and stay updated automatically.
Table of Contents
- Concrete Slab Calculator
- Quick Answer
- Related Calculators
- How This Concrete Slab Calculator Works
- How to Use the Concrete Slab Calculator
- Core Formulas
- Key Terms
- Worked Example
- Real-Life Examples
- Concrete Slab Calculator vs Concrete Calculator
- Concrete for Common Slab Sizes
- Bags or Ready-Mix?
- Common Mistakes to Avoid
- Frequently Asked Questions
- References & Sources
How This Concrete Slab Calculator Works
Enter the size of the slab and its thickness. The calculator works out the volume, adds your waste allowance, and turns it into everything you need to buy: cubic yards for a ready-mix truck, or the number of bags if you mix it yourself. It also gives the gravel for the base, a simple rebar grid, the weight of the finished slab and, if you enter prices, the cost.
It is built for people who pour more than once. Press Save to keep a job in this browser (nothing is sent to us), use Share link to send the exact numbers to a customer or a supplier, Print a clean material list, and Compare two versions, such as a 4 in and a 5 in slab.
Quick explanation:
- Cubic yards: length (ft) × width (ft) × thickness (in) ÷ 12 ÷ 27.
- Bags: cubic feet ÷ bag yield (0.60 cu ft for an 80 lb bag).
- Waste: 5% to 10% covers spills, uneven ground and form bulges.
How to Use the Concrete Slab Calculator
- Enter the slab length and width in feet (or switch Units to Metric).
- Enter the thickness in inches. Patios and walks are often 4 in; check your plans.
- Set the waste allowance, the bag size and, if you want them, the gravel base depth and rebar spacing.
- Add prices per cubic yard or per bag to see the cost.
- Read the order, then Save the job, Share it, Print it, or keep it as A to compare another thickness.
Core Formulas
- Volume (cu ft): length × width × thickness in inches ÷ 12
- Cubic yards: cubic feet ÷ 27
- With waste: volume × (1 + waste %)
- Ready-mix order: cubic yards rounded up to the next 1/4 yard
- Bags: cubic feet with waste ÷ bag yield, rounded up. Yields: 40 lb 0.30, 50 lb 0.375, 60 lb 0.45, 80 lb 0.60, 90 lb 0.675 cu ft
- Gravel base (cu yd): length × width × base depth in inches ÷ 12 ÷ 27
- Rebar grid: bars along the length = width in inches ÷ spacing + 1 (rounded down, then + 1); the same the other way
- Weight: cubic feet × 150 lb (normal-weight concrete)
Key Terms
- Cubic yard: 27 cubic feet, the unit ready-mix concrete is sold in.
- Bag yield: how much mixed concrete one bag makes, printed on the bag.
- Subgrade: the compacted soil under the slab.
- Base: a layer of compacted gravel between the soil and the slab.
- Control joint: a groove cut in the slab so it cracks in a straight line.
- Cold joint: a weak line where fresh concrete meets concrete that has already started to set.
Worked Example
A back patio is 20 ft long, 12 ft wide and 4 in thick, on a 4 in gravel base, with rebar every 18 in and 5% extra.
- Volume = 20 × 12 × 4 ÷ 12 = 80 cu ft = 2.96 yd³
- With 5% waste: 84 cu ft = 3.11 yd³, so order 3.25 yd³ of ready-mix
- Or bagged: 84 ÷ 0.60 = 140 bags of 80 lb mix
- Gravel base: 20 × 12 × 4 ÷ 12 ÷ 27 = 2.96 yd³
- Rebar: 9 bars 20 ft long and 14 bars 12 ft long = 348 ft of bar before laps
- Weight: 80 × 150 = 12,000 lb, about 6.0 tons
Real-Life Examples
- A 10 × 10 ft shed pad, 4 in: 33.3 cu ft = 1.23 yd³, or 56 bags of 80 lb mix (no waste added).
- A 12 × 10 ft hot tub pad, 4 in, 5% extra: 1.56 yd³, or 94 bags of 60 lb mix.
- A 24 × 24 ft garage floor, 4 in, 10% extra: order 8.00 yd³ of ready-mix, 7.11 yd³ of gravel for a 4 in base, and 1,200 ft of rebar for a 12 in grid.
- A 30 × 40 ft shop floor, 6 in, 5% extra: 23.3 yd³, so order 23.50 yd³. That is about 45 tons of concrete.
Concrete Slab Calculator vs Concrete Calculator
- Concrete Calculator: quick volumes for many shapes (slabs, round holes, tubes, curbs, stairs).
- This Concrete Slab Calculator: one shape, the full job: order size, bags, gravel base, rebar grid, weight, cost, plus save, share, print and compare.
- Use both: work out odd shapes on the Concrete Calculator, then plan the slab here.
Concrete for Common Slab Sizes
| Slab (ft) | Area (sq ft) | Cubic yards | 80 lb bags |
|---|---|---|---|
| 4 × 4 | 16 | 0.21 | 10 |
| 6 × 6 | 36 | 0.47 | 21 |
| 8 × 8 | 64 | 0.83 | 38 |
| 10 × 10 | 100 | 1.30 | 59 |
| 10 × 12 | 120 | 1.56 | 70 |
| 12 × 12 | 144 | 1.87 | 84 |
| 12 × 16 | 192 | 2.49 | 112 |
| 16 × 20 | 320 | 4.15 | 187 |
| 20 × 20 | 400 | 5.19 | 234 |
| 24 × 24 | 576 | 7.47 | 336 |
Bags or Ready-Mix?
Bagged mix is handy for small slabs, but the bag count rises fast. A 10 × 10 ft pad 4 in thick needs 56 bags of 80 lb mix (4,480 lb to lift and mix). Above roughly 1 cubic yard most people order ready-mix, because one truck delivers it already mixed and the whole slab is poured at once, with no cold joints between batches.
- Small pads and repairs: bags, mixed in a wheelbarrow or a small mixer.
- Patios, garage floors, driveways: ready-mix, ordered with 5% to 10% extra.
- Ask about short-load fees: many suppliers charge extra for small loads. Enter the price per yard to compare.
Common Mistakes to Avoid
- Mixing feet and inches. Thickness is in inches: 4 in is 0.333 ft, not 4 ft.
- No extra concrete. Running short mid-pour leaves a cold joint. Order 5% to 10% more.
- Ignoring the base. A soft or uneven subgrade makes the slab thicker in spots and uses more concrete.
- Counting bags by weight. Use the bag yield, not the weight: an 80 lb bag makes only 0.60 cu ft.
- Skipping control joints. Plan joints so cracks form in straight lines; the mix maker’s sheet suggests cutting them every 6 to 8 ft in a 4 in slab.
Frequently Asked Questions
At 4 in thick: 4.94 cubic yards, or 5.19 with 5% extra.
45 bags. A yard is 27 cu ft, and one 80 lb bag makes about 0.60 cu ft (27 ÷ 0.60 = 45).
56 bags of 80 lb mix at 4 in thick, before waste.
Patios, walks and many garage floors are 4 in. Driveways for heavier vehicles are often 5 to 6 in. Your plans or building department decide.
About 150 lb per cubic foot. A 4 in slab weighs about 50 lb per square foot.
Not always. Many small patios have none, while garage and shop floors often use rebar or wire mesh. Follow your plans and local code.
Enter the base depth to get cubic yards. 4 in is common, but the right depth depends on your soil.
Type a name such as Back patio and press Save. The job stays in this browser only; open it from the box at the top of the calculator.
Yes. Press Share link: it copies a link that opens this calculator with the same inputs.
Calculate the 4 in slab and press Compare: keep as A. Change the thickness to 5 and press Calculate to see both side by side.
Yes. Suppliers sell in steps (often 1/4 yard), and being short is worse than a little left over.
Only the amount: a 60 lb bag makes 0.45 cu ft and an 80 lb bag 0.60 cu ft. The total weight of mix you need is the same.
Yes. Switch Units to Metric to enter meters and centimeters and get cubic meters, kilograms and tonnes.
Follow the mix maker’s instructions; normal concrete usually takes about a day before light foot traffic and longer before vehicles.
References & Sources
| Source | Used For | Link |
|---|---|---|
| QUIKRETE, Concrete Mix No. 1101 data sheet | Bag yields for 40, 50, 60, 80 and 90 lb bags; control joints every 6 to 8 ft. | https://www.quikrete.com/PDFs/DATA_SHEET-Concrete%20Mix%201101.pdf |
| Washington State DOT, Design Memorandum: Unit Weight of Concrete (2010) | 150 lb per cu ft for normal-weight concrete. | https://wsdot.wa.gov/eesc/bridge/designmemos/05-2010.htm |